Kamoa-Kakula lowers 2027 copper guidance as its smelter runs at about 60% of capacity
Ivanhoe Mines said on 3 November that Kamoa-Kakula in DR Congo had lowered its 2027 guidance to 300,000–350,000 tonnes of copper in saleable products. Its existing smelter continues to operate at about 60% of design capacity, according to the company.
Original source ↗