Kamoa-Kakula copper smelter operates at about 60% capacity during recovery
Ivanhoe Mines said in its 3 November third-quarter report that the Kamoa-Kakula smelter in the DRC is operating at about 60% of design capacity in line with concentrate production. Underground mining recovery continues.
Original source ↗